Ministry of Road Construction, Road Furniture & Maintenance

THE ACTIVITIES OF ANAMBRA STATE GOVERNMENT ON ROAD CONSTRUCTION UNDER CHIEF WILLIE OBIANO’S ADMINISTRATION

01. THE ACTIVITIES OF ANAMBRA STATE GOVERNMENT ON ROAD CONSTRUCTION UNDER CHIEF WILLIE OBIANO’S ADMINISTRATION

THE ACTIVITIES OF ANAMBRA STATE GOVERNMENT ON ROAD

CONSTRUCTION UNDER CHIEF WILLIE OBIANO’S ADMINISTRATION

S/N NAME OF ROAD CONTRACTOR CONSULTANT CONTRACT SUM (N) DATE  OF AWARD LENGTH (KM) COMPLETION PERIOD REMARKS
               
1 Rehabilitation of Onitsha-Enugwu Old Road (Nkpor Junction-Amawbia Section) C.C.C. Nig. Ltd.
Plot 3836 Danube Street, off IBB Highway Maitama, Abuja.
Engee Nig. Ltd.
Plot 21/80 Niger close
Housing Estate fegge, Onitsha.
9,126,533,884.20 22nd Oct. 2008 28.2 72 weeks Completed,  Commissioned by H.E Chief Willie Obiano
2 Reconstruction of Awkuzu-Igbariam Road with spur to Achalla C.C.C. Nig. Ltd.
Plot 3836 Danube Street, off IBB Highway Maitama, Abuja.
Abers Associates
67, College Road
Abakpa Nike,
   1,400,000,000.00 May-13 13.30 18 months Completed,  Commissioned by H.E Chief Willie Obiano
3 Recunstruction of Abube Square Nando – Afor Igbariam Road. New Idea Construction Co. Ltd KM 16 Port – Harcourt Road Owerri Abers Associates
67, College
Road
Abakpa Nike,
1,336,482,336.70 Jul-13 6.3 28 weeks Completed by H.E Chief Willie Obiano
4 Construction of Access Road and Bridge from Umueje to the Oil Well Heat at Aguleriotu Estrada Construction Ltd.No I lagos Street Ewet Housing Uyo, Akwa – Ibom State Umec Associates    5,000,000,000.00 Oct-13 18 months Re-awarded by H.E Chief Willie Obiano,

Work is on-going

5 Construction of Access Roads at the Greenwood City, Awka Tamad Construction Ltd Ike Compound Ndikelionwu Ngonyama Okpanam Associates Limited.    3,650,000,000.00 Oct-13 8.244 18 months Re-awarded by H.E Chief Willie Obiano,

Work is on-going

6 Bishop Okonkwo Road (Ichi) to Nkwo Edo Market and Emeka Okwuosa/Emeka Offor Road to St Michael Secondary School Ozubulu/ NAUTH Road Junction Grand Star Limited 26 Park Road Aba Nnoli & Ekanem Design Associates.    1,350,000,000.00 Dec-13 7.3 12 months Re-awarded by H.E Chief Willie Obiano,

Work is on-going

7 Construction of Achina Oneh Agbudu Ogboji Estrada Construction Ltd.No I lagos Street Ewet Housing Uyo, Akwa – Ibom State       770,000,000.00 Dec-14 5.3 1 year Awarded by H.E Chief Willie Obiano,

Work is on-going

8 Reconstruction of Anambra State Integrated Livestock Farm Nkwelle Ezunaka Tamad Construction Ltd Ike Compound Ndikelionwu    1,600,000,000.00 Dec-13 6 1 year Awarded by H.E Chief Willie Obiano,

Work is on-going

9 Construction of Jetty/ Roads within the Naval Base and Roads Between Atani Roads. Ministry of Works Awka Ministry of Works Awka       700,000,000.00 Dec-13 6 months Awarded by H.E Chief Willie Obiano,

Work is on-going

10 Amansea – Ndiukwuenu – Okpeze- Amaeteiti- Awgbu Road Part II Cossel Construction Ltd  75b East – West Road Port – Harcourt. Siblark Nuel Associates    3,650,000,000.00 Mar-14 24 months Awarded by H.E Chief Willie Obiano,

Work is on-going

11 Construction of Ugwunwasike – Azu Ogbunike – Amawa – Osile – Ifite – Umueri – St Monica – College Road. Sagez Nig. Ltd.                                 Plot 25 Block C, Kaltungo Street, Garki II, Abuja. Nnoli & Ekanem Design Associates.    1,440,000,000.00 Mar-14 7.9 18 months Awarded by H.E Chief Willie Obiano,

Work is on-going

12 Construction of Ozzu Umunachi Road LA-LAZCO Construction Company Nig. Ltd RESCA  Services Limited 130 Adetola Street Aguda-Surulere Lagos.       725,000,000.00 Mar-14 4.2 12 months Awarded by H.E Chief Willie Obiano,

Work is on-going

13 Construction of Akwaeze- Adazi Enu Road Road Messers Paul B PLC       430,000,000.00 Mar-14 2.3 10 months Awarded by H.E Chief Willie Obiano,

Work is on-going

14 Construction of Access Road to Civil Servants Housing Estate,Isiagu Ministry of Works Awka Ministry of Works Awka       550,000,000.00 Mar-14 2 6 months Awarded by H.E Chief Willie Obiano,

Work is on-going

15 Reconstruction of Omor – Umumbo Road Ayamelum Local Government Area Estrada Construction Ltd    1,575,000,000.00 Mar-14 8.1 2 years Awarded by H.E Chief Willie Obiano,

Work is on-going

16 Construction of Anaocha LGA Neni- Nkpuota, Adazi Ani Road Pachucs Engr. Ltd.
Km 3 Onitsha Owerri road, Onitsha.
Fistraw Designs Asso.
70 Agbani Road, Enugu.
      205,000,000.00 Mar-14 1 8 months Awarded by H.E Chief Willie Obiano,

Work is on-going

17 Additional Works and Spur to Amesi (in the reconstruction of Ekwulobia- Nkpologwu- Akpo – Achina- Umuchu) Road Ministry of Works Awka Ministry of Works Awka       145,000,000.00 Mar-14 6 months Awarded by H.E Chief Willie Obiano,

Work is on-going

18 Construction of Ozoemena Onyali Crescent, Okpuno Ministry of Works Awka Ministry of Works Awka       145,000,000.00 Mar-14 6 months Awarded by H.E Chief Willie Obiano,

Work is on-going

19 Construction of Aguleri Uno- Aguleri Otu- Enugu Otu- Oil Rig Road Junction Anambra State and Bridge No 2 C.C.C. Nig. Ltd.
Plot 3836 Danube Street, off IBB Highway Maitama, Abuja.
Umec Associates  14,295,000,000.00 May. 2014 42 36 months Awarded by H.E Chief Willie Obiano,

Work is on-going

20 Construction of Spur- Iyiora Anam Anambra West LGA Anambra State and Bridge No 1 Kanubeen Construction Nig Ltd    3,670,000,000.00 May-14 7.834 24 Months Awarded by H.E Chief Willie Obiano,

Work is on-going

21 Construction of  3 No Fly Over Awka IDC Consultant Limited 5 Chari close off Str Bobo  Off IBB Way Maitama Abuja    9,137,806,264.72 Jul-14 18 months Awarded by H.E Chief Willie Obiano,

Work is on-going

22 Construction of Nchekwube Onochie Street – Ezu River, Road Aguleri Doliz Brown Group       923,886,205.60 Aug-14 3.635 6 months Awarded by H.E Chief Willie Obiano,

Work is on-going

24 Construction of Nnewi Urban Roads: Coscharis Road, Onuzulike Okonkwo, and Francis Maduka Road Pachucs Engineering Ltd Nnoli and Partners.    1,176,122,347.19 Dec-14 6.17 12 months  Awarded by H.E Chief Willie Obiano,

Work is on-going

25 Construction of PHCN Roads C.C.C. Nig. Ltd.
Plot 3836 Danube Street, off IBB Highway Maitama, Abuja.
Engee Nig. Ltd.
Plot 21/80 Niger Close Housing Estate fegge, Onitsha.
      490,536,603.89 Dec-14 1.398 6 months Completed,  Commissioned by H.E Chief Willie Obiano
27 Reconstruction of Additional Roads in Okpuno, Awka: Road Linling Abakaliki Street-Ngozika Housing Estate, Awka. Ministry of Works Ministry of Works       256,897,796.57 Dec-14 1 2 months Awarded by H.E Chief Willie Obiano,

Work is on-going

28 Construction of Six (6) Street and Ama Igwe with its Flood Control Works in Aguleri, Anamabra State Ministry of Works Ministry of Works       906,982,328.20 Dec-14 6 18 months Awarded by H.E Chief Willie Obiano,

Work is on-going

29 Construction of Roads in Emu Aguleri, Anambra State Ministry of Works Ministry of Works       171,563,690.00 Dec-14 1 1 month Completed by H.E Chief Willie Obiano
30 Construction of Section2: Mmiata-Nzam Road Kanubeen Constr,Nig Ltd. Plot 24 Road 21, PW Extension, FCT, Abuja.  10,030,992,206.44 Dec-14 10.5 36 months Awarded by H.E Chief Willie Obiano,

Work is on-going

31 Construction of Udi and Ukpor Street Ministry of Works/Army Engineers Ministry of Works/Army Engineers       424,613,111.84 Jan-15 1.1 3 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

32 Construction of Ajasa Ministry of Works/Army Engineers Ministry of Works/Army Engineers       339,735,300.60 Jan-15 0.75 3 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

33 Construction of Ezenwa and Sanniez Streets Ministry of Works/Army Engineers Ministry of Works/Army Engineers       379,523,892.81 Jan-15 0.80 3 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

34 Construction of Allen Street Ministry of Works/Army Engineers Ministry of Works/Army Engineers       153,123,892.81 Jan-15 0.38 3 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

35 Construction of Umunya Airport Road Kanubeen Constr,Nig Ltd. Plot 24 Road 21, PW Extension, FCT, Abuja.    3,200,000,000.00 Jan-15 4.5 18 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

36 Construction of Nteje -Umueri Air[port Road Kanubeen Constr,Nig Ltd. Plot 24 Road 21, PW Extension, FCT, Abuja.    2,695,350,276.92 Jan-15 4 20 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

37 Construction of Aguleri-Otuocha-Umueri Airport Road C.C.C. Nig. Ltd.
Plot 3836 Danube Street, off IBB Highway Maitama, Abuja.
   4,700,000,000.00 Jan-15 8.5 30 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

38

 

Construction of Oye Utuh-Akwuata-Court Road Nnewi South LGA Grand Star Limited 26 Park Road Aba       532,976,949.80 Jan-15 3.32 7 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

39 Construction of Access Road to COCHEDS AGRO-INDUSTRIES LTD, Anaku,Ayamelum LGA Mac Mourtz Nig.Ltd       170,492,540.00 Jan-15 1.075 3 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

40 Construction of Awkuzu/SARS Junction- Abube Square,Nando Minstry of Works Minstry of Works       908,550,323.97 Feb-15 4.6 12 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

41 Construction of Ogbuaka-Mgbuka-Amazu/Owerri Road,Onitsha Single Carriageway CCEDC Nig. Ltd    1,602,011,924.77 Feb. 2015 4.1 12 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

42 Construction of Afor-Umunya-Ogbunike Road with Spur to Community Sec. School Umunya Daniels Construction Company Limited    1,784,518,510.09 Feb. 2015 9.6 30 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

43 Construction of Uzoakwa-Ubahuekwem-Oseakwa Road with Spur to Oluoha Okechukwu Road with a 3kn Stone Base. Tamad Construction Company Ltd.    1,885,728,865.46 Feb. 2015 11.3 30 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

44 Construction of Ezira – Umuomaku- Enugwu-Umuonyia-Achina Road with 1 No 20m Span Bridge Arab Contractors O.A.O. Nigeria    4,121,332,012.50 Mar-15 12 15 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

45 Construction of Oba (RE Onitsha-Owerri Road/ International Market- Umuoji Road with I Nio Bridge Stefanutti Stocks Hapel Nigeria Limited  3,756,344.033.05 Apr-15 10.4 18 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

46 Construction of Nkwo-Enugwu-Ukwu-Onitsha/ Enugu Expressway Road Akumast Nig. Ltd,No 1 Bent Lane, Off Abakiliki Road G.R.A. Enugu    1,549,972,709.31 Apr-15 5.958 24 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

47 Construction of Chisco House to Osumenyi Town Road Martex Constr. Int’l Ltd. 2B Dr. Alex Ifebi Street Road 18 Udoka Housiing Estate Awka.       823,352,333.01 Apr-15 3.4 12 months Newly Awarded

by H.E Chief Willie Obiano,

Work is on-going

\

HON. COMMISSIONER CHINWUBA TOURS FAILED PORTION OF EKWULOBIA- EZINIFITE ROAD.

02. HON. COMMISSIONER CHINWUBA TOURS FAILED PORTION OF EKWULOBIA- EZINIFITE ROAD.

Okoli Sunday

Anambra State Commissioner for Works, Law Chinwuba has recently inspected the failed portion of Ekwulobia – Ezinifite Road.

Following the heavy downpour few days ago, the watershed outlet at Ekwulobia along the newly completed Ekwulobia – Ezinifite Road experienced overbearing flood action leading to the failure of the water outlet and wash off of a small portion of the tarred road.

The major causes of the failure as discovered during an inspection tour this morning are: the blockage of the drainage with sand which led to flood running on the newly tarred road; and low capacity culvert constructed by the contractor to serve as the water outlet.

Thus, the traditional ruler of the town who was part of the inspection team has assured that the youths will be stopped from blocking the drains henceforth, while the contractor handling the road has been directed to immediately fix the failed portion and rebuild the water outlet by installing a bigger capacity culvert and drains.

Hon. Chinwuba further called on the people to help in protecting governments Projects as he remarked. “As the government endeavours to bring dividends of democracy to the people through #Obiano Effect, it’s part of our civic responsibility to ensure that these projects are protected let’s avoid any action that obstructs free flow of water through the drainage, Flood Kills!”